Monday, April 27, 2009

Bridge Project - Test Day

The final test day for the bridge project was today. We came in first! Our bridge held a maximum of 721.57 lbs and weighed only 240 grams. The main part that failed first was the supports that the bridge rests on when sitting in the metal test box, as seen in the following picture:

This is our test data. The second peak of the graph is when the bottom part of the bridge hit a small ridge on the box and was re-supported.

This is the aftermath:


Friday, April 24, 2009

Bridge Project - Day 8

We put the finishing touches on our final design today. We shortened the width of the bridge, and reinforced the supports connecting the two outer edgers of the bridge.

Wednesday, April 22, 2009

Bridge Project - Day 7

Today we continued constructing our final bridge. In addition to building our bridge, we also built an airplane. The airplane is so fast it was difficult to capture, but we managed to get this shot.
Also, here is our final bridge. The design is the same so far, what will change is the supports connecting these pieces.

Monday, April 20, 2009

Bridge Project - Day 6

We reinforced our prototype and conducted more stress tests to see which components would fail first so we could strengthen the weaknesses in our bridge. After, we began constructing the components of our final bridge using wood glue.

Friday, April 17, 2009

Bridge Project - Prototype Testing

We tested our prototype today. The first point of failure for our prototype was the platform at the top of our bridge. It held about 310 lbs before the platform started to buckle.

Wednesday, April 15, 2009

Bridge Project - Day 5



We finished our bridge prototype today.

Monday, April 13, 2009

Bridge Project - Day 4

We continued building our bridge prototype.