The final test day for the bridge project was today. We came in first! Our bridge held a maximum of 721.57 lbs and weighed only 240 grams. The main part that failed first was the supports that the bridge rests on when sitting in the metal test box, as seen in the following picture:
This is our test data. The second peak of the graph is when the bottom part of the bridge hit a small ridge on the box and was re-supported.
This is the aftermath: